Streamsong® Resort - Polk County, FL

HS20 timber vehicular bridgeStreamsong® Resort, featuring two world-class, 18-hole golf courses, is on track to become one of Florida's premier getaways.

The resort is being developed by The Mosaic Company, the world's leading producer of crop nutrients made from phosphate mined in central Florida. Mosaic reclaims thousands of acres of previously mined lands each year for recreational, commercial and environmental uses. The company's commitment to environmental stewardship was a key consideration in awarding Bridge Builders USA, Inc. the project to construct two bridges on the site of the resort's golf courses, which are scheduled to open for play in fall 2012.

HS20 timber vehicular bridgeBridge Builders USA, Inc. utilized "top-down" construction in setting the bridge piles at the former mine site. The project was especially challenging in that water levels in the lakes the bridges traverse had been temporarily drawn down by the developer to accommodate shaping of the adjacent landscape, creating a large differential from base to bridge deck.

Top-down construction, a design solution spearheaded by Bridge Builders USA, Inc. for the timber bridge industry, is an accelerated construction method whereby we can build timber bridges in wetlands and other environmentally sensitive areas with minimal impact to the environment. The result: our bridges fit beautifully in their natural settings and are installed in a manner which helps preserve some of our nation's prime environmentally sensitive areas and wetlands.

Relevant Project Elements:

  • Land Surveying
  • Geotechnical Investigation
  • Bridge Design
  • Preparation of Plans and Specifications for Multiple Bridges
  • Environmental Compliance

Residential Covered Bridge Project Complete - Plover, WI

HS20 timber vehicular bridgeBridge Builders USA, Inc. recently completed a residential covered bridge project in Plover, Wisconsin. The seven ton vehicular covered bridge, built to accommodate the property's grade, features a 44 foot covered section and approximately 115 feet of open, curved decking.

Pictured is owner John Noel driving his 1934 Brewster across the newly completed covered bridge.

 

Observation and Tower Construction Here

Download Brochure

Photo Gallery

Video Gallery

Testimonial

Roddie Bailey
President
Ibis Lake Development, Inc

Your crew just completed the Ibis Lake bridge and I wanted to take this opportunity to tell you how pleased we are with the finished product and how much we enjoyed working with Mark Winters and your construction crew. The quality of the work on the bridge well exceeds our expectations. Your bridge will be one of the highlights of the Ibis Lake development. We can't say enough about Mark and your crew. Every member of your construction crew was professional, efficient, courteous, and cooperative. They were overall the best subcontractor crew I have ever worked with on any project.

I will be pleased to give Bridge Builders an outstanding reference to anyone who contacts us. Feel free to have any of your potential customers come by and see our bridge. Please stop by Ibis Lake and see the finished product when you are in the area. Thanks for a job well done!!!!!!